Bridge the gap between operations & engineering
Bridge the gap between operations & engineering
Bridge the gap between operations & engineering

ErgoS on and off shore involved in gas extraction project Egypt.

Occasionally, we are involved in one project through different contractors and perspectives. This is the case with a BP project for gas extraction in the West Nile Delta. ErgoS designed the on-shore control room as part of the Yokogawa project for BP. In the first months of 2018, Van Oord’s fall pipe ship ‘Stornes’ starts dredging at a depth of 600 m, a unique job. ErgoS designs the corresponding workplaces, control panels and user interfaces.

©2016 Ergos    |     Disclaimer     |     Sitemap
Ontwerp: Webton.nl